Tower setions arrived on site. They are wrapped to prevent paint loss.
|
|
This tower was erected with a 220V My-Te rope capstan winch.
|
|
The tower bracket for the winch. The cleat is used to tie down the rope
|
|
All tower section were pre-fitted on the ground.
|
|
Each of the 3 meter sections was numbered when the 6 bolt holes were drilled.
|
|
The first 3 sections are up. Time for the first set of Philystran guy cable.
|
|
12 sections up, 3 more to go. The Philystran cable has to be attached every 15 meters.
|
|
The top section's 2 thrust bearings and rotor plate are aligned on the ground.
|
|
2 inch OD 4 meter long pipes used for the cable messenger supports..
|
|
The crew stringing the coax and rotor cable to the messenger.
|
|
160 dipole, 80 meter yagi and 20 meter yagi. For more photos see the South Tower collection.
|
|
|