18 Beverage poles, ready to go, for 180 Meter long beverage
|
|
Each Beverage support consists of a PVC pipes and a 1.2
meter long x 12mm fiberglass rods.
|
|
CN2R beverage layout showing the 2 NA/AF and EU/SA beverages
|
|
North/South 180 Meters long Bidirectional beverage
|
|
North American / African phased staggered beverage layout. The Cross fire feed
system is used
|
|
NA/AF 220 meter staggered beverage.View from the 45 meter
tower
|
|
NA / AF beverage has 5 meters spacing and 20 meter staggering. See Phasing Design
section for more details.
|
|
Middle East / Carribean 180 meter long bidirectional
beverage
|
|
Europe / South American phased staggered beverage layout.
The Cross fire feed system is used
|
|
EU / SA 180 meter staggered beverage.View from the 45 meter
tower
|
|
EU / SA beverage has 5 meters spacing and 20 meter staggering. See Phasing Design
section for more details.
|
|
View of the EU-SA, ME-CA, and N / S beverages from the 45
meter South tower
|
|
EU / SA beverage right feedpoint. Left feedpoint not shown
|
|
EU / SA beverage right feedpoint. Each beverage is fed with
2 RG6 quad shielded coaxes. 2 Coaxes are used to allow simltaneous EU and SA
reception for SO2R
|
|
EU / SA beverage left feedpoint. Right feedpoint not shown
|
|
Home Brew Beverage termination box with 2 meter ground rod
|
|
Staggered beverage feedline 'Magic-T' splitter. Each phased beverage has two of
these boxes
|
|
Magic-T splitter attached to left and right staggered
beverage. The feedline from the shack is attached on the bottom.
|
|
Each of the 6 beverage parallel linesare wound back onto the reel at the end of
each contest.
|
|
The beverage pvc pipes are washed before being bundled and
stored. Each beverage wire uses 18 to 22 poles and 100 to 200 meters of RG6 quad
coax.
|
|
The beverage pvc pipes are washed before being bundled and stored. Each beverage
wire uses 18 to 22 poles and 100 to 200 meters of RG6 quad coax.
|
|
|