Large Cable reel stand used to roll out coax, radials and rotor cable.
|
|
Pipe stands used to elevate work area to 1.2 meters.
|
|
Two parallel tram cables used to raise large antennas.
|
|
Tractor 3-point used to seperate and anchor tram cables.
|
|
Tram sled drawing. Rolling blocks, on top, hang the sled from 2 tram wires and metal bars suspend
a beam below the sled.
|
|
160M dipole suspended from Tram via "scare straps". Metal bars were not used due to mounting restrictions
|
|
Tram sled with antenna suspension bars. Bars are cut to allow the antenna to pivot 45 degrees.
|
|
Bottom of the sled showing Bar attachement flanges. A removable pin is used at each end of the bar for attachment.
|
|
Top of the sled showing the rolling block flanges. A removable pin secures the rolling blocks between the flanges.
|
|
The sled with bars/pins removed. The large eyelet, on the side of the sled, is for attaching the pulling cable.
|
|
Electric winch shelf that is mounted to the base of the tower.
|
|
The sled with bars/pins removed. The large eyelet, on the side of the sled, is for attaching the pulling cable.
|
|
Electric Capstan winch and shelf in action.
|
|
Copper replacement coils for the 160M rotating dipole. The frame is made of UV proof Seaboard.
|
|
Stainless hardware and fiber support rods on the coils.
|
|
Bracket for securing the coils to the tower section on the dipole.
|
|
Force12 WARC7 metal standoffs disintegrated after 6 months. These standoffs were made of a cheap magnesium alloy that did interacted with the aluminum.
|
|
Another view of the damage.
|
|
All of these standoffs had to be removed.
|
|
The standoffs were replaced with aluminum angle stock. The hard drawn wire was replaced by copper wire that was attached to phillystran for support.
|
|
The WARC7 element supports were replaced with Phillystran and stainless steel wire.
|
|
Rotor and coax are also stored in the storage room.
|
|
Storage closet to store cables and ropes for antenna erection.
|
|
Tower paint and more cable in storage.
|
|
Brihm supplies all cement tools.
|
|
Cable messenger pipe ready for cement.
|
|
Tractor 3-point and cable are used to remove 2 meter ground rods.
|
|
A 1/4 inch aircraft cable is used for pulling the ground rod.
|
|
A smaller ground rod has been removed to relocate the antenna.
|
|
M'fuddle repairs the wall on the stairs going to the shack.
|
|
The Tailtwister rotator bottom brake housing with bad corrosion from the sea.
|
|
|